Big Creek Powerhouse #3



You might also be interested in

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Progress picture looking east from house 16, showing excavated bench for houses 17 to 24 inclusive. [Sewer and water line trench excavated in road in front of these houses.]

    photCL SCE 02 - 41616

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Progress picture showing completed grading for upper row of houses 16 to 24 inclusive. Pipe for 6" water line strung out prior to trenching in road for installation.

    photCL SCE 02 - 40724

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Progress picture looking east from house 13. Steel forms for foundation concrete, house 12 being erected. 4" water and 6" sewer mains in trench along road.

    photCL SCE 02 - 41618

  • Big Creek Powerhouse #4

    Big Creek Powerhouse #4

    Visual Materials

    Big Creek Powerhouse #4 - Construction pictures taken by Dam & Tunnel Office. [guniting excavated basin to hold water for Batch Plant]

    photCL SCE 02 - 41936

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Riveting section of 18' outlet pipe inside Tunnel 3, showing bracing, inside and outside the pipe to assure circular shape in preparation for placing concrete seal around pipe.

    photCL SCE 02 - 08934

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Penstock 3 Vent Pipe from upper road.