Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage
You might also be interested in

Borel Powerhouse - Kern River Borel 3rd stage
Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage - American Pipe Company's field plant for fabrication of pipe siphons. Lowering outer steel form for 10'6" diameter by 16' long section of concrete pipe. Progress picture during construction of overflow dam.
photCL SCE 02 - 40047

Borel Powerhouse - Kern River - Borel Conduit Modifications 3rd stage
Visual Materials
Borel Powerhouse - Kern River - Borel Conduit Modifications 3rd stage - American Pipe Company's set-up for fabrication fo 10'6" I.D. concrete pipe for use in Kern River & Rich Gulch Siphons. Picture taken from canal berm at Station 94+00
photCL SCE 02 - 40041

Borel Powerhouse - Kern River - Borel 3rd stage
Visual Materials
Borel Powerhouse - Kern River - Borel 3rd stage - shot of trench excavation through rock near center of river channel.
photCL SCE 02 - 40044

Borel Powerhouse - Kern River Borel 3rd stage
Visual Materials
Borel Powerhouse - Kern River Borel 3rd stage - Progress picture showing placement of transit-mix concrete in pier forms - Overflow Dam.
photCL SCE 02 - 40051

Borel Powerhouse - Borel 3rd Stage
Visual Materials
Borel Powerhouse - Borel 3rd Stage - Progress picture along siphon north of Kern River Crossing. Hoist used for closing pipe sections mounted in foreground.
photCL SCE 02 - 40072

Borel Powerhouse - Kern River - Borel 3rd stage
Visual Materials
Borel Powerhouse - Kern River - Borel 3rd stage - Shows work accomplished on construction of new concrete flume at Tilley #3 prior to canal outage when steel flume can be removed. Concrete piers raised and backfilled for floor slab support with the exception of two center spans which were left open for drainage.
photCL SCE 02 - 40043