Visual Materials
Borel Powerhouse - Borel Canal
You might also be interested in

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Placing gunite reinforcement mesh North of Bodfish Flume.
photCL SCE 02 - 29267

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - New gunite in place to right and reinforcing mesh showing ready for guniting at left. (South of Bodfish Flume).
photCL SCE 02 - 29265

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Repair: replacing gunite near station 242+00.
photCL SCE 02 - 26956

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Repair: finishing gunite near station 242+00.
photCL SCE 02 - 26957

Borel Powerhouse - Borel Canal
Visual Materials
Borel Powerhouse - Borel Canal - Placing 3" mesh reinforced concrete floor over existing floor at station 3+00.
photCL SCE 02 - 30548

Borel Powerhouse - Borel Canal, Mar 1937 Gunite repair (reinforced)
Visual Materials
Borel Powerhouse - Borel Canal, Mar 1937 Gunite repair (reinforced) - showing waterline with "cracked & checked condition above line and good condition below line (no cracks or checks except at old construction joints.
photCL SCE 02 - 23450