Visual Materials
Borel Powerhouse - Borel Canal
- Description
- Borel Powerhouse - Borel Canal - Placing 3" mesh reinforced concrete floor over existing floor at station 3+00.
- Date
- 1/17/1951
- Call number
- photCL SCE 02 - 30548
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Borel Powerhouse - Borel Canal - Placing 3" concrete floor slab.
photCL SCE 02 - 26966

Visual Materials
Borel Powerhouse - Borel Canal - Placing 3" concrete floor slab.
photCL SCE 02 - 26967

Visual Materials
Borel Powerhouse - Borel Canal - Placing 2" unreinforced concrete addition to floor slab.
photCL SCE 02 - 30580

Visual Materials
Borel Powerhouse - Borel Canal - Placing 1.5" thick concrete floor on section lined in 1937.
photCL SCE 02 - 30561

Visual Materials
Borel Powerhouse - Borel Canal - Placing gunite canal wall lining at approximate station 25+00 by Johnson-Western.
photCL SCE 02 - 30542

Visual Materials
Borel Powerhouse - Borel Canal - Placing gunite reinforcement mesh North of Bodfish Flume.
photCL SCE 02 - 29267