Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Boulder-Chino Transmission Line (3rd)



You might also be interested in

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Looking upstream from south side of drainage ditch.

    photCL SCE 02 - 26773

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Looking northeast across portion of cone east of Howard drainage ditch.

    photCL SCE 02 - 26772

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 at mile 103. Detail of vertical bank facing north. Material below 1.3' is fine gravel. Material above is clay. Bank about 8.5' high.

    photCL SCE 02 - 27893

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - M62T4. North ground wire just prior to tensioning.

    photCL SCE 02 - 26733

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Hayfield-Chino Line - sandy wash.

    photCL SCE 02 - 26648

  • Boulder-Chino Transmission Line (3rd)

    Boulder-Chino Transmission Line (3rd)

    Visual Materials

    Boulder-Chino Transmission Line (3rd) - Storm damage near M42T2. Looking northerly along old road in front and north of Mr. Dunn's property.

    photCL SCE 02 - 26734