Visual Materials
Boulder-Chino Transmission Line (3rd)
You might also be interested in

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Looking upstream from south side of drainage ditch.
photCL SCE 02 - 26773

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Looking northeast across portion of cone east of Howard drainage ditch.
photCL SCE 02 - 26772

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - showing excavation of soil at and between towers 1 to 2 at mile 103. Detail of vertical bank facing north. Material below 1.3' is fine gravel. Material above is clay. Bank about 8.5' high.
photCL SCE 02 - 27893

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - M62T4. North ground wire just prior to tensioning.
photCL SCE 02 - 26733

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Hayfield-Chino Line - sandy wash.
photCL SCE 02 - 26648

Boulder-Chino Transmission Line (3rd)
Visual Materials
Boulder-Chino Transmission Line (3rd) - Storm damage near M42T2. Looking northerly along old road in front and north of Mr. Dunn's property.
photCL SCE 02 - 26734