Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #3 - Unit #3, Internal view from above floor level, showing air vent, runner cone, runner, etc.
photCL SCE 02 - 26745

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Unit #1 General view of draft tube with air vent intalled.
photCL SCE 02 - 26741

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Floor of 4th Unit draft tube.
photCL SCE 02 - 27711

Visual Materials
Big Creek Powerhouse #3 - Fourth unit draft tube & relief valve liners
photCL SCE 02 - 27421
Image not available
Visual Materials
Photographs of Powerhouse No. 3, Part 1. Construction photographs of first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.
photCL SCE

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Unit #3, Internal view looking thru the upper draft tube man hole.
photCL SCE 02 - 26744