Visual Materials
Big Creek Powerhouse #3 - PH #3 - 4th unit - Gravity grouting bottom of draft tube liner.
photCL SCE 02 - 27797

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Unit #1 General view of draft tube with air vent intalled.
photCL SCE 02 - 26741

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Unit #3, Internal view looking thru the upper draft tube man hole.
photCL SCE 02 - 26744

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Floor removal and excavation for 4th unit.
photCL SCE 02 - 27622

Visual Materials
Big Creek Powerhouse #3 - Unit #3, Internal view from within the lower draft tube, below floor level, showing air vent, runner cone, and runner etc...
photCL SCE 02 - 26746

Visual Materials
Big Creek Powerhouse #3 - PH #3 - 4th unit penstock.
photCL SCE 02 - 27618