Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Long Beach Steam Station, Plant #2 - Unit 8-R



You might also be interested in

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit 8-R Hot well & condenser shell. [plus similar shot (#25444: Unit 8-R assembly low pressure shell) on same photocard].

    photCL SCE 02 - 25443

  • Long Beach Steam Station, Plant #2 - Unit 8-R

    Long Beach Steam Station, Plant #2 - Unit 8-R

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit 8-R - [?] turbine supports. [Plus three additional shots (#25455: Typical conduit bends & supports, #25456: trenches in floor under condenser, & #25457: assembly high pressure end Unit 8R) on same photocard].

    photCL SCE 02 - 25454

  • Long Beach Steam Station, Plant #2 - Unit 8-R

    Long Beach Steam Station, Plant #2 - Unit 8-R

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit 8-R - Construction progress. [Plus two additional shots (#25448: Placing return water box condenser prior to rolling condenser shell into position, & #25449: leveling pads for generator sole plates) on same photocard].

    photCL SCE 02 - 25447

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit 8-R Auxiliary Power Transformers [Plus additional shot (#25555: Top view placing 8-R generator field) on same photocard].

    photCL SCE 02 - 25483

  • Long Beach Steam Station, Plant #2 - Unit 8-R

    Long Beach Steam Station, Plant #2 - Unit 8-R

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit 8-R - Platform around east circulating water valve. [Plus additional shot (#25668: completed except for painting) on same photocard].

    photCL SCE 02 - 25667

  • Long Beach Steam Station, Plant #2 - Unit 8-R

    Long Beach Steam Station, Plant #2 - Unit 8-R

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit 8-R - Unloading condenser shell [Plus three additional shots (#25377: Unloading first sections of 8R condenser shell, & #25378 & #25379 (safety negs): moving house generator) on same photocard].

    photCL SCE 02 - 25376