Big Creek, Florence Lake Dam - Arch 8 asbestile coating torn off near haunch 8-9
photCL SCE 02 - 23131

Visual Materials
Big Creek, Florence Lake Dam - Arch #8 close-up of Asbestile torn by snow load
photCL SCE 02 - 23976

Visual Materials
Big Creek, Florence Lake Dam - Maintenance patching of Asbestile Waterproofing - Arch #47.
photCL SCE 02 - 26506

Visual Materials
Big Creek, Florence Lake Dam - Arch #8 Coated with Asbestile.
photCL SCE 02 - 24637

Visual Materials
Big Creek, Florence Lake Dam - Asbestile coated Extrados at Arch #8.
photCL SCE 02 - 24585

Visual Materials
Big Creek, Florence Lake Dam - Method of waterproofing day's work joints on Arch 52, before guniting. 6" strips of asphalt impregnated felt was tacked to the arch between two applications of asbestile waterproofing.
photCL SCE 02 - 24724