Visual Materials
Boulder-Chino Transmission Line (2nd)
You might also be interested in

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Making second lift consisting of two bottom panels.
photCL SCE 02 - 23236

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - "Hanging up" bottom panels of tower by hand at M220-T5.
photCL SCE 02 - 23541

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Making up conductor dead-end connection.
photCL SCE 02 - 23550

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Getaway for 2nd Boulder-Chino line from the Chino Rack on right. First Boulder-Chino line is on the left.
photCL SCE 02 - 24425

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Clearing on 1st & 2nd Boulder-Chino Line, looking north.
photCL SCE 02 - 24423

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Reel set-up and "Bull" wheel at M1-T1 etc.
photCL SCE 02 - 23232