Visual Materials
Big Creek, Florence Lake Dam
- Description
- Big Creek, Florence Lake Dam - Jack hammering surface of arch 7, preparing face for Asbestile coating.
- Date
- 5/11/1940
- Call number
- photCL SCE 02 - 23021
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Downstream face of Arch 54 showing its generally dry condition as a result of a second coating of asbestile last fall.
photCL SCE 02 - 29207

Visual Materials
Big Creek, Florence Lake Dam - Upstream face of River Section. [coating applied to surface and sluice gates visible at bottom of Arch 53].
photCL SCE 02 - 14336

Visual Materials
Big Creek, Florence Lake Dam - Arch #2 Gunite repair preparation Bush hammering surface.
photCL SCE 02 - 22954

Visual Materials
Big Creek, Florence Lake Dam - experimental coatings - detail Arch #8, J.M. "Asbestile" coating.
photCL SCE 02 - 22952

Visual Materials
Big Creek, Florence Lake Dam - Dam detail of Asbestile coating.
photCL SCE 02 - 27349

Visual Materials
Big Creek, Florence Lake Dam - detail showing texture of Asbestile coating.
photCL SCE 02 - 27350