Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Boulder-Chino Transmission Line - Men making up Reinforcement cages for concrete Piles.
photCL SCE 02 - 22997

Visual Materials
Boulder-Chino Transmission Line - Pouring concrete for pile footings.
photCL SCE 02 - 23150

Visual Materials
Boulder-Chino Transmission Line - Pouring concrete for pile footings.
photCL SCE 02 - 23220

Visual Materials
Boulder-Chino Transmission Line (2nd) - Drilling for concrete piles M229-T5.
photCL SCE 02 - 23262

Visual Materials
Boulder-Chino Transmission Line (2nd) - Drilling holes for concrete piles in Vineyard at location M218-T2.
photCL SCE 02 - 23261

Visual Materials
Boulder-Chino Transmission Line - pouring concrete in stubs - Mi. 176-3.
photCL SCE 02 - 20255