Visual Materials
Boulder-Chino Transmission Line (2nd)
You might also be interested in

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Drilling holes for concrete piles in Vineyard at location M218-T2.
photCL SCE 02 - 23261

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Checkers at M173-T5.
photCL SCE 02 - 23276

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting Tower with corner gin pole M218-T5
photCL SCE 02 - 23542

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - "Hanging up" bottom panels of tower by hand at M220-T5.
photCL SCE 02 - 23541

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Tower M0-T5 with wire stringing completed and bird guards etc. placed.
photCL SCE 02 - 23242

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Placing concrete for tower foundations by "Hi-Line"
photCL SCE 02 - 23239