Boulder-Chino Transmission Line (2nd)
You might also be interested in

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - "Hanging up" bottom panels of tower by hand at M220-T5.
photCL SCE 02 - 23541

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Drilling for concrete piles M229-T5.
photCL SCE 02 - 23262

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting Tower with corner gin pole M218-T5
photCL SCE 02 - 23542

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Tower M0-T5 with wire stringing completed and bird guards etc. placed.
photCL SCE 02 - 23242

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Getaway for 2nd Boulder-Chino line from the Chino Rack on right. First Boulder-Chino line is on the left.
photCL SCE 02 - 24425

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Clearing on 1st & 2nd Boulder-Chino Line, looking north.
photCL SCE 02 - 24423