Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Boulder-Chino Transmission Line (2nd) - "Hanging up" bottom panels of tower by hand at M220-T5.
photCL SCE 02 - 23541

Visual Materials
Boulder-Chino Transmission Line (2nd) - Drilling for concrete piles M229-T5.
photCL SCE 02 - 23262

Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting Tower with corner gin pole M218-T5
photCL SCE 02 - 23542

Visual Materials
Boulder-Chino Transmission Line (2nd) - Tower M0-T5 with wire stringing completed and bird guards etc. placed.
photCL SCE 02 - 23242

Visual Materials
Boulder-Chino Transmission Line (2nd) - Getaway for 2nd Boulder-Chino line from the Chino Rack on right. First Boulder-Chino line is on the left.
photCL SCE 02 - 24425

Visual Materials
Boulder-Chino Transmission Line (2nd) - Transposition at M216-T3 alongside first Boulder-Chino T/L.
photCL SCE 02 - 24424