Visual Materials
The penstock at the top of the hoist line about to be lowered into the tunnel at Kern River #1 Hydro Plant.
photCL SCE 01 - 00620

Visual Materials
Kern River #1 Hydro Plant - Method of riveting sections of the penstock inside the tunnel at.
photCL SCE 01 - 00622
Image not available
Visual Materials
Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.
photCL SCE

Visual Materials
Kern River #1 - Pouring concrete around the penstock pipe leading to the powerhouse, 1906.
photCL SCE 01 - 00624

Visual Materials
Kern River #1 - site for Democrat Dam, dam construction and drainage tower, intake, dam spilling, construction at Camp 4, flume, Kern River Canyon, Hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles, Camp 1, penstock construction, branch pipes, powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel & buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line, Tejon, Castaic & Fernando Substations, L. A. #3 steam plant...
photCL SCE 13 - vol 063