Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Florence Lake Dam - Extrados of Arch No. 52. Taken during guniting operations on this arch. Gunited to elevation 7235 and chipped to elevation 7296.
photCL SCE 02 - 24191

Visual Materials
Big Creek, Florence Lake Dam - Method of waterproofing day's work joints on Arch 52, before guniting. 6" strips of asphalt impregnated felt was tacked to the arch between two applications of asbestile waterproofing.
photCL SCE 02 - 24724

Visual Materials
Big Creek, Florence Lake Dam - Guniting operations on Arch #53 Extrados.
photCL SCE 02 - 24016

Visual Materials
Big Creek, Florence Lake Dam - Day's Work Joint Repair April 1940. Guniting on Arch 13 and chipping on Arch 14.
photCL SCE 02 - 22876

Visual Materials
Big Creek, Florence Lake Dam - Day's Work Joint Repair April 1940. Arch #51 after guniting.
photCL SCE 02 - 22877

Visual Materials
Big Creek, Florence Lake Dam - Arch #18 after extrados inspection.
photCL SCE 02 - 22866