Visual Materials
Big Creek, Huntington Lake Dams - Dam 1 progress photo showing east end of area back of sluice gate stems. Chipping in progress. water elevation 6896
photCL SCE 02 - 22458

Visual Materials
Big Creek, Huntington Lake Dams - Dam 1 progress photo showing west section of area back of sluice gate stems. Chipping in progress. Note application of dock coating over small area west of vertical key along west side of gunite area. water elevation 6896
photCL SCE 02 - 22460

Visual Materials
Big Creek, Huntington Lake Dams - Ice overhang between sluice gates stems from near top of dam.
photCL SCE 02 - 44044

Visual Materials
Big Creek, Huntington Lake Dams - Copy of Page 3 of Stone & Webster Report on Backfills on Dams at Huntington Lake: 4. Dam #1 - Badly disintegrated and porous concrete in vertical joint near station 5+66, elevation 690-4, after partial removal. Part of old repair plug in lower left center. 5. Dam #1 - Area near station 5+66, elevation 6904. Chipping in progress. Note two holes from which air escaped when applied to 4" drain through downstream backfill. 6. Dam #1. A second view of leak intakes near station 5+66, elevation 6904'. 7. Dam #1. Area near station 5+66, elevation 6904' after guniting.
photCL SCE 02 - 21846

Visual Materials
Big Creek, Huntington Lake Dams - Placing concrete in back of steel sheets in section adjacent to 72" sluice gate - Dam #1.
photCL SCE 02 - 43683

Visual Materials
Big Creek Huntington Lake Dams - Dam #1 [rubble and seepage near sluice gate outlets].
photCL SCE 02 - 14889