Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Powerhouse 2 & 2A - Pressure Main S.O. Valve in house - Powerhouse 2A



You might also be interested in

  • Powerhouse 2 & 2A - Pressure Main S.O. Valve in house

    Powerhouse 2 & 2A - Pressure Main S.O. Valve in house

    Visual Materials

    Powerhouse 2 & 2A - Pressure Main S.O. Valve in house - Powerhouse 2A

    photCL SCE 02 - 15644

  • Powerhouse 2 & 2A - Pressure Main

    Powerhouse 2 & 2A - Pressure Main

    Visual Materials

    Powerhouse 2 & 2A - Pressure Main - Two anchors and Riveted Pipe.

    photCL SCE 02 - 15645

  • Powerhouse 2 & 2A

    Powerhouse 2 & 2A

    Visual Materials

    Powerhouse 2 & 2A - Pressure Main anchor and banded steel penstock pipe.

    photCL SCE 02 - 15642

  • Powerhouse 2 & 2A

    Powerhouse 2 & 2A

    Visual Materials

    Powerhouse 2 & 2A - Pressure Main anchor and plain steel penstock pipe.

    photCL SCE 02 - 15643

  • Image not available

    Big Creek: Powerhouse No. 2 and 2a (part 3)

    Visual Materials

    Photographs of Powerhouse 2 and 2A, Part Three. Construction at Powerhouse 2A, images depicting the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at Powerhouse 2A.

    photCL SCE

  • Powerhouse 2a construction variant of 02-14738

    Powerhouse 2a construction variant of 02-14738

    Visual Materials

    Powerhouse 2a construction [variant of 02-14738].

    photCL SCE 02 - 14738a