Skip to content

Visual Materials

Big Creek Powerhouse #3



You might also be interested in

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Penstock #3 Spherical Manifolds assembled with 2 penstock branches connected to Butterfly Valve House.

    photCL SCE 02 - 09427

  • Big Creek Powerhouse #3 - Penstock #3 - Interior of the spherical manifolds at the top of Penstock #3

    Big Creek Powerhouse #3 - Penstock #3 - Interior of the spherical manifolds at the top of Penstock #3

    Visual Materials

    Big Creek Powerhouse #3 - Penstock #3 - Interior of the spherical manifolds [at the top of Penstock #3 - branches at right are blocked off for future installations.]

    photCL SCE 02 - 09450

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - PH #3 spherical penstock manifolds.

    photCL SCE 02 - 22969

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Tunnel #3 outlet and manifolds.

    photCL SCE 02 - 23935

  • Image not available

    F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps

    Visual Materials

    Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.

    photCL SCE

  • Big Creek Powerhouse #3

    Big Creek Powerhouse #3

    Visual Materials

    Big Creek Powerhouse #3 - Penstock 3 Manifold from top of valve house, showing connections provided for three units in addition to the three constructed in 1923, and branch penstocks connecting with valve house in foreground.

    photCL SCE 02 - 12060