Visual Materials
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #3 - Spherical manifolds at top of Penstock 3 [bridging gap between Tunnel 3 outlet on left and Valve House on right.
photCL SCE 02 - 12061

Visual Materials
Big Creek Powerhouse #3 - Penstock #3 Spherical Manifolds assembled with 2 penstock branches connected to Butterfly Valve House.
photCL SCE 02 - 09427

Visual Materials
Big Creek Powerhouse #3 - PH #3 spherical penstock manifolds.
photCL SCE 02 - 22969

Visual Materials
Big Creek Powerhouse #3 - Construction plant for P.H. #3 and penstock ridge. Mill Creek diversion flume at lower right. Camp 37 at top of penstock excavation.
photCL SCE 02 - 08532

Visual Materials
Big Creek Powerhouse #3 - Aggregate Plant at top of penstock 3, Camp #36.
photCL SCE 02 - 08970

Visual Materials
Big Creek Powerhouse #3 - Erection of triple vent pipes at top of penstock.
photCL SCE 02 - 08971