Visual Materials
Powerhouse 2a
- Description
- Powerhouse 2a. - Construction [framing stage] - close-up view of foundation.
- Date
- 9/11/1927
- Call number
- photCL SCE 02 - 14732
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse 2a - Construction (framing stage) - Close-up view of the foundation, wheel pits, structural steel, etc. for Powerhouse #2A.
photCL SCE 02 - 14731

Visual Materials
Powerhouse 2a. construction [during steel framing stage].
photCL SCE 02 - 14741

Visual Materials
Powerhouse 2a - lowering Ferrum pipe into place at anchor #8, giving a little more of a close-up of the anchor itself.
photCL SCE 02 - 14831

Visual Materials
Powerhouse 2a construction. Looking downstream at PH2 and foundation for PH2a.
photCL SCE 02 - 14317

Visual Materials
Big Creek Powerhouse 2A - Close-up of coil connections. "U" is not installed yet.
photCL SCE 02 - 28767