Visual Materials
Powerhouse 2a construction
- Description
- Powerhouse 2a construction. Looking downstream at PH2 and foundation for PH2a.
- Date
- 5/2/1927
- Call number
- photCL SCE 02 - 14317
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Powerhouse 2a - Looking downstream across foundation.
photCL SCE 02 - 14733

Visual Materials
Powerhouse 2a - Looking downstream at Powerhouse #2, showing the structural steel work of PH #2A.
photCL SCE 02 - 14734

Visual Materials
Powerhouse 2A - Looking down at Powerhouse 2 & 2A.
photCL SCE 02 - 14833

Visual Materials
Big Creek Powerhouse 2a - Construction (framing stage) - Close-up view of the foundation, wheel pits, structural steel, etc. for Powerhouse #2A.
photCL SCE 02 - 14731

Visual Materials
Powerhouse 2a. - Construction [framing stage] - close-up view of foundation.
photCL SCE 02 - 14732