Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Mono-Bear Diversion - Looking downstream at site of the dam on Mono Creek from the north bank of the creek, showing diversion flume, intake end of flowline, bins for concrete aggregate in upper left-hand part of picture and concrete forms for the dam in lower right hand corner. .
photCL SCE 02 - 14721

Visual Materials
Big Creek, Mono-Bear Diversion - Diversion flume at diversion on Bear Creek. This flume, of course, is to be used temporarily during excavation for foundation of dam and pouring of concrete. Structure on the right is the crushing and mixing plant. .
photCL SCE 02 - 14389

Visual Materials
Big Creek, Mono-Bear Diversion - Looking north across Mono Creek at site of Mono Dam. Men can be seen working in the trench and the section of forms in the center of the picture has already been filled with the first concrete poured in the construction of this dam. The flume extending across the picture is for diverting Mono Creek through the dam while construction is underway. One of the sections at the intake end of the Mono flowline is showing in the bottom of the picture.
photCL SCE 02 - 14719

Visual Materials
Big Creek, Mono-Bear Diversion - Another view showing excavation for trench, north end of Mono Dam.
photCL SCE 02 - 14398

Visual Materials
Big Creek, Mono-Bear Diversion - Looking downstream from the upstream end of the temporary flume at the site of the Mono Creek Dam.
photCL SCE 02 - 14720

Visual Materials
Big Creek, Mono-Bear Diversion - Looking upstream showing downstream face of Bear Dam and temporary flume used for diversion of water while this dam was under construction.
photCL SCE 02 - 14718