Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Mono-Bear Diversion - Looking upstream showing downstream face of Bear Dam and temporary flume used for diversion of water while this dam was under construction.
photCL SCE 02 - 14718

Visual Materials
Big Creek, Mono-Bear Diversion - Looking downstream at site of the dam on Mono Creek from the north bank of the creek, showing diversion flume, intake end of flowline, bins for concrete aggregate in upper left-hand part of picture and concrete forms for the dam in lower right hand corner. .
photCL SCE 02 - 14721

Visual Materials
Big Creek, Mono-Bear Diversion - View of Mono flowline, looking upstream from the sandy point opposite Camp 80. Mono Dam site.
photCL SCE 02 - 14701

Visual Materials
Big Creek, Mono-Bear Diversion - Looking downstream showing upstream face of Bear Creek diversion dam. Please note how the trees have been cut in clearing for the small reservoir. The intake end of the Bear tunnel is shown just to the right of the top of the dam.
photCL SCE 02 - 14710

Visual Materials
Big Creek, Mono-Bear Diversion - Looking upstream at site of Mono Diversion Dam, showing clearing operations for the small reservoir. Building in background is pumphouse for Camp 80 water supply.
photCL SCE 02 - 14381

Visual Materials
Big Creek, Mono-Bear Diversion - Mono-Bear Siphon, looking downstream.
photCL SCE 02 - 23388