Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

C1.3 - Maps - Drawing



You might also be interested in

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Big Creek-San Joaquin River Water Power Development [includes planned powerhouses that were never built].

    photCL SCE 02 - 13277

  • C1.3 - Maps - Drawing

    C1.3 - Maps - Drawing

    Visual Materials

    C1.3 - Maps - Drawing - "Pagett" -- Florence Lake Tunnel. [Profile crossectional drawing with "head" for Powerhouses 1, 2, 2A, 5, 8, 3, & 4. PH 5 was never built and design for PH4 shows a long tunnel from PH 3 to PH4 forebay that was not part of the constructed design].

    photCL SCE 02 - 10608

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Big Creek development map. Exhibit B - includes northern diversions and plants that were never built.

    photCL SCE 02 - 08147

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Profile drawing of the existing Big Creek Project for the 1927 Annual Report. [Drawing shows Powerhouses 1, 2, 2A, 8 and 3; Florence Lake, Huntington Lake, Shaver Lake and their associated tunnel systems; and the Mono Creek & Bear Creek Diversions].

    photCL SCE 02 - 14129

  • C1.3 - Maps - Map for the Big Creek project

    C1.3 - Maps - Map for the Big Creek project

    Visual Materials

    C1.3 - Maps - Map for the Big Creek project - Exhibit "B" for SCE's hydroelectric development on the San Joaquin River. Includes PH 6 and PH 7 which were never built..

    photCL SCE 02 - 05451

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Map of Big Creek development showing Powerhouses 1, 2&2A, 8, and 3.

    photCL SCE 02 - 13579