Visual Materials
C1.3 - Maps
You might also be interested in

C1.3 - Maps
Visual Materials
C1.3 - Maps - Profile drawing of the existing Big Creek Project for the 1927 Annual Report. [Drawing shows Powerhouses 1, 2, 2A, 8 and 3; Florence Lake, Huntington Lake, Shaver Lake and their associated tunnel systems; and the Mono Creek & Bear Creek Diversions].
photCL SCE 02 - 14129

C1.3 - Maps - Drawing
Visual Materials
C1.3 - Maps - Drawing - "Pagett" -- Florence Lake Tunnel. [Profile crossectional drawing with "head" for Powerhouses 1, 2, 2A, 5, 8, 3, & 4. PH 5 was never built and design for PH4 shows a long tunnel from PH 3 to PH4 forebay that was not part of the constructed design].
photCL SCE 02 - 10608

C1.3 - Maps
Visual Materials
C1.3 - Maps - Big Creek-San Joaquin River Water Power Development [includes planned powerhouses that were never built].
photCL SCE 02 - 13277

C1.3 - Maps
Visual Materials
C1.3 - Maps - Map showing the ultimate development of the Big Creek Power System
photCL SCE 02 - 04874

C1.3 - Maps
Visual Materials
C1.3 - Maps - Mr. Barre at map showing proposed development of the San Joaquin River and Big Creek. He is pointing to Florence Lake Reservoir.
photCL SCE 02 - 10431

Map of Big Creek No. 8 Development for Val. Dept
Visual Materials
Map of Big Creek No. 8 Development for Val. Dept. - includes location of Powerhouses 8, 2, & 2a, Dams 5 & 6, Tunnel 8, Camps 7, 31, 32, 33, & 42, penstock, transmission lines, roads and railroads.
photCL SCE 02 - 16223