Skip to content

Visual Materials

C1.3 - Maps



You might also be interested in

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Profile drawing of the existing Big Creek Project for the 1927 Annual Report. [Drawing shows Powerhouses 1, 2, 2A, 8 and 3; Florence Lake, Huntington Lake, Shaver Lake and their associated tunnel systems; and the Mono Creek & Bear Creek Diversions].

    photCL SCE 02 - 14129

  • C1.3 - Maps - Drawing

    C1.3 - Maps - Drawing

    Visual Materials

    C1.3 - Maps - Drawing - "Pagett" -- Florence Lake Tunnel. [Profile crossectional drawing with "head" for Powerhouses 1, 2, 2A, 5, 8, 3, & 4. PH 5 was never built and design for PH4 shows a long tunnel from PH 3 to PH4 forebay that was not part of the constructed design].

    photCL SCE 02 - 10608

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Big Creek-San Joaquin River Water Power Development [includes planned powerhouses that were never built].

    photCL SCE 02 - 13277

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Map showing the ultimate development of the Big Creek Power System

    photCL SCE 02 - 04874

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Mr. Barre at map showing proposed development of the San Joaquin River and Big Creek. He is pointing to Florence Lake Reservoir.

    photCL SCE 02 - 10431

  • Map of Big Creek No. 8 Development for Val. Dept

    Map of Big Creek No. 8 Development for Val. Dept

    Visual Materials

    Map of Big Creek No. 8 Development for Val. Dept. - includes location of Powerhouses 8, 2, & 2a, Dams 5 & 6, Tunnel 8, Camps 7, 31, 32, 33, & 42, penstock, transmission lines, roads and railroads.

    photCL SCE 02 - 16223