Visual Materials
Big Creek Powerhouse #3
- Description
- Big Creek Powerhouse #3 - Making up connection between 18' Penstock and Manifold.
- Date
- 9/20/1923
- Call number
- photCL SCE 02 - 09448
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #3 - Penstock #3 Manifold Sphere #2 made up.
photCL SCE 02 - 09108

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Sandblasting penstock manifold.
photCL SCE 02 - 29254

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Sandblasting penstock manifold.
photCL SCE 02 - 29255

Visual Materials
Big Creek Powerhouse #3 - 700 cfs of water at transition between 18' Penstock and flume at Camp 37.
photCL SCE 02 - 09422

Visual Materials
Big Creek - Powerhouse #3 (part 1) [first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.]
photCL SCE 13 - vol 032

Visual Materials
Big Creek Powerhouse #3 - Unit 4 - Penstock construction - Butterfly valve near manifold.
photCL SCE 02 - 28277