Big Creek Powerhouse #3 - Unit 4 - Penstock construction
You might also be interested in
Image not available
Big Creek Powerhouse #3 - Unit 4
Visual Materials
Big Creek Powerhouse #3 - Unit 4 - Assembly of penstock & butterfly valve to turbine.
photCL SCE 02 - 28290

Big Creek Powerhouse #3 - Unit 4 - Penstock construction
Visual Materials
Big Creek Powerhouse #3 - Unit 4 - Penstock construction - steel support at ring girder.
photCL SCE 02 - 28264
Image not available
Big Creek Powerhouse #3 - Unit 4
Visual Materials
Big Creek Powerhouse #3 - Unit 4 - Penstock construction between vent pipes and Upper Valve House.
photCL SCE 02 - 28276

Big Creek Powerhouse #3 - Unit 4
Visual Materials
Big Creek Powerhouse #3 - Unit 4 - Scroll case and butterfly valve in place.
photCL SCE 02 - 28287

Big Creek Powerhouse #3 - Unit 4
Visual Materials
Big Creek Powerhouse #3 - Unit 4 - Connecting butterfly valve "Y" branch to Scroll Case.
photCL SCE 02 - 28280

F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps
Visual Materials
F.P.C. Vol 3, Projects 67 & 120 - Construction Big Creek Powerhouse 3 and construction camps. [Tunnel 3 - intake construction, portal adit Camp 36, Camp 35 adit, outlet portal, Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to carry sluicing water at outlet, surge chamber, Powerhouse 3 construction, installation of 3 penstocks, turbine and generator installations at PH #3, 220 kV switchyard.]
photCL SCE 13 - vol 009