Visual Materials
Santa Ana River #3 Powerhouse
- Description
- Santa Ana River #3 Powerhouse - Jacking up 99 foot span to remove sags.
- Date
- 5/1/1926
- Call number
- photCL SCE 02 - 13371
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Santa Ana River #3 Powerhouse - Another view of jacking up 99 foot span to remove sags.
photCL SCE 02 - 13372

Visual Materials
Santa Ana River #3 Powerhouse - Raising copper 99 ft. span to remove sag.
photCL SCE 02 - 13360

Visual Materials
Santa Ana River #3 Powerhouse - Placing [steel flume] sheets in 99 foot span.
photCL SCE 02 - 11779

Visual Materials
Santa Ana River #3 Powerhouse - Looking downstream on 99 foot truss span [steel frame flume under construction]
photCL SCE 02 - 11759

Visual Materials
Santa Ana River #3 Powerhouse - View looking downstream on 99 foot [flume] trestle showing sag in spans.
photCL SCE 02 - 11784

Visual Materials
Santa Ana River #3 Powerhouse - Looking upstream [on flume] from under long span.
photCL SCE 02 - 13373