Big Creek Powerhouse #3
- Description
- Big Creek Powerhouse #3 - Assembly of 18' outlet pipe for Tunnel 3
- Date
- 6/8/1923
- Call number
- photCL SCE 02 - 08912
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #3 - Inspecting interior of 18' outlet pipe, Tunnel 3.
photCL SCE 02 - 09402

Visual Materials
Big Creek Powerhouse #3 - Riveting section of 18' outlet pipe inside Tunnel 3, showing bracing, inside and outside the pipe to assure circular shape in preparation for placing concrete seal around pipe.
photCL SCE 02 - 08934

Visual Materials
Big Creek Powerhouse #3 - Air operated Webb-Cox concrete placing gun used for placing concrete around 18' pipe in Tunnel 3 Outlet.
photCL SCE 02 - 09198

Visual Materials
Big Creek Powerhouse #3 - PH 3 - Typical corrosion inside 18' diameter pipe - outlet Tunnel #3.
photCL SCE 02 - 28360

Visual Materials
Big Creek Powerhouse #3 - Tunnel 3 Outlet - constructing 18' penstock.
photCL SCE 02 - 08933

Visual Materials
Big Creek Powerhouse #3 - Tunnel 3 - Intake gunite floor between 18' pipe and the trash rack.
photCL SCE 02 - 30517