Big Creek Powerhouse #3 - Tunnel 3
- Description
- Big Creek Powerhouse #3 - Tunnel 3 - Intake gunite floor between 18' pipe and the trash rack.
- Date
- 1/24/1951
- Call number
- photCL SCE 02 - 30517
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #3 - Tunnel 3 - Intake gunite floor between 18' pipe and the trash rack.
photCL SCE 02 - 30518

Visual Materials
Big Creek Powerhouse #3 - Tunnel 3 - Intake gunite floor between 18' pipe and the trash rack.
photCL SCE 02 - 30519

Visual Materials
Big Creek Powerhouse #3 - Tunnel 3 - Intake gunite floor between 18' pipe and the trash rack.
photCL SCE 02 - 30520

Visual Materials
Big Creek Powerhouse #3 - Intake gunite floor between Trash Rack and the 18' pipe.
photCL SCE 02 - 30513

Visual Materials
Big Creek Powerhouse #3 - PH #3 - Tunnel #3 space between trash rack and 18' pipe from which muck was picked up and carried through Unit #1.
photCL SCE 02 - 28352

Visual Materials
Big Creek Powerhouse #3 - Tunnel 3 looking thru 18' Penstock from trash rack.
photCL SCE 02 - 09451