Big Creek Powerhouse #3
- Description
- Big Creek Powerhouse #3 - Hydraulic and steam shovel excavation for Powerhouse #3 foundation.
- Date
- 7/13/1922
- Call number
- photCL SCE 02 - 08001
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #3 - Dewatering pumps and Steam Shovel just starting excavation at Dam Site #6.
photCL SCE 02 - 08093

Visual Materials
Big Creek Powerhouse #3 - Looking upstream at Dam #6 site. Steam shovel in foreground just starting sloping excavation for bed of dam which will be midway between shovels. On right is excavation on rock for dam to rest against.
photCL SCE 02 - 08091

Visual Materials
Big Creek Powerhouse #3 - First steam shovel work on Powerhouse #3.
photCL SCE 02 - 07984

Visual Materials
Big Creek Powerhouse #3 - First steam shovel work on Powerhouse #3.
photCL SCE 02 - 07985

Visual Materials
Big Creek Powerhouse #3 - First steam shovel work on Powerhouse #3.
photCL SCE 02 - 07986

Visual Materials
Big Creek - Powerhouse #3 (part 2) [Generator floor with Units 1, 2, & 3 installed, excavation of Powerhouse 3 site with steam shovel and high pressure water gun, Switchyard construction, turbine parts, battery room, construction of penstocks, turbine assembly. Powerhouse #1 - penstock construction for Unit 3.]
photCL SCE 13 - vol 033