Powerhouse 8
- Description
- Powerhouse 8 - Framework [and first steel up]
- Date
- 6/4/1921
- Call number
- photCL SCE 02 - 06871
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Powerhouse 8 [with steel framework completed] - Looking down penstock pathway [with forms for concrete penstock footings excavated and ready for pour.]
photCL SCE 02 - 06876

Visual Materials
Powerhouse #8 - View of Dam 5 - [Framework being set up for the construction Dam]
photCL SCE 02 - 06711

Visual Materials
Powerhouse #8 - View of Dam 5 - [Framework being set up for the construction Dam. Corner of Powerhouse 2 is visible in the backgound]
photCL SCE 02 - 06712

Visual Materials
Powerhouse 8 - Framework construction with Steam shovel excavating along side the framing.