Visual Materials
Big Creek, Shaver Lake Dam
- Description
- Big Creek, Shaver Lake Dam - From Shaver tunnel in winter
- Date
- 2/20/1920
- Call number
- photCL SCE 02 - 05575
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek, Shaver Lake Dam - Lower portal Shaver tunnel, from inside tunnel looking out.
photCL SCE 02 - 05545

Visual Materials
Big Creek, Shaver Lake Dam - Shaver Flume from tunnel end [during construction].
photCL SCE 02 - 06768

Visual Materials
Big Creek, Shaver Lake Dam - Big Creek Siphon from Camp 71 tunnel dump.
photCL SCE 02 - 26933

Visual Materials
Big Creek, Shaver Lake Dam - New pipe from Shaver Tunnel drift to connect old #2 tunnel at Adit 8.
photCL SCE 02 - 07595

Visual Materials
Big Creek, Shaver Lake Dam - New pipe from Shaver Tunnel drift to connect old #2 tunnel at Adit 8.
photCL SCE 02 - 07596

Visual Materials
Big Creek, Shaver Lake Dam - Shaver Tunnel intake.
photCL SCE 02 - 06077