Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Big Creek Powerhouse #8 - New pipe from Shaver tunnel drift to connect with old No. 2 tunnel at Adit #8.
photCL SCE 02 - 07597

Visual Materials
Big Creek, Shaver Lake Dam - General view of conditions around the new dam, old dam, and the intake to Shaver Tunnel.
photCL SCE 02 - 14309
Image not available
Visual Materials
Shaver Lake No. 1. Shaver Dam construction, including original lake bed, logging area of expansion, blacksmith shop, weirs at sawmill, Shaver Lake office and mess hall, original dam, surveys for new dam, Shaver Tunnel, Shaver flume from old dam entering tunnel, Adit 8 excavation, flushing tunnel outlet, Shaver Lake Railroad, Camp 11, lumber operations, Camp 19, Shaver cookhouse fire, dismantling Shaver railroad.
photCL SCE

Visual Materials
Big Creek, Shaver Lake Dam - Vent pipe on Shaver penstock.
photCL SCE 02 - 07932

Visual Materials
Big Creek, Shaver Lake Dam - Old Shaver Lake Dam.
photCL SCE 02 - 04606

Visual Materials
Big Creek, Shaver Lake Dam - Lower portal Shaver tunnel, from inside tunnel looking out.
photCL SCE 02 - 05545