Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

C1.3 - Maps



You might also be interested in

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Distribution map of lines near Shaver Lake.

    photCL SCE 02 - 19067

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Profile drawing of the existing Big Creek Project for the 1927 Annual Report. [Drawing shows Powerhouses 1, 2, 2A, 8 and 3; Florence Lake, Huntington Lake, Shaver Lake and their associated tunnel systems; and the Mono Creek & Bear Creek Diversions].

    photCL SCE 02 - 14129

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Contour map of proposed lower dam site - Shaver Lake.

    photCL SCE 02 - 04865

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Map of entire Edison Service area [with transmission lines and generation sources from Big Creek and Kern River to southern California]

    photCL SCE 02 - 04110

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Mr. Barre at map showing proposed development of the San Joaquin River and Big Creek. He is pointing to Florence Lake Reservoir.

    photCL SCE 02 - 10431

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Key Map of Big Creek project.

    photCL SCE 02 - 13540