Visual Materials
Site for construction of Powerhouse #4.
photCL SCE 05 - 53610

Visual Materials
Big Creek 4 construction work: three men planning work at Powerhouse #4 or Dam 7construction site.
photCL SCE 05 - 53685

Visual Materials
Power tunnel construction for Powerhouse #4 project. Driver on heavy equipment in tunnel.
photCL SCE 05 - 53612

Visual Materials
Big Creek Powerhouse #4 - Construction pictures taken by Dam & Tunnel office. [site for powerhouse 4 viewed from lower portal of Tunnel #2 - graded area on left is for Switchyard]
photCL SCE 02 - 42420

Visual Materials
View of construction site of Kaweah #2 hydro plant, March 1904, showing workers excavating for powerhouse foundations.
photCL SCE 04 - 00001

Visual Materials
Big Creek #4 project: Construction shot of Penstock running down slope to Powerhouse #4. - with a group of (16) 4x5, documented, color transparancies with an invalid numbering scheme. They are SCE negs but, have been placed in the Misc. catagory as default.
photCL SCE 10 - 00097