Big Creek. Powerhouse #2
You might also be interested in

Construction Big Creek Powerhouse 1 and 2
Visual Materials
Construction Big Creek Powerhouse 1 and 2 [Construction PH 2, & PH 1; Camp 2 Warehouse, meat storage and butchers; concrete mixers; Camps 3, 6, & 7; Adit 2, & 3; Cascada yards; transmission line construction; construction at Dams 1, 2, 3, & 4, flow-line, penstocks, surge shaft; incline railway; Tunnels 1, & 2; Huntington Lake.]
photCL SCE 13 - vol 003

Big Creek Powerhouse #3 - PH 3
Visual Materials
Big Creek Powerhouse #3 - PH 3 - Pile of sand, boulders, and debris in Tunnel #3 surge chamber.
photCL SCE 02 - 28359

Big Creek PH #2
Visual Materials
Big Creek PH #2 - Anchor #21 (125 tons) and concrete chutes
photCL SCE 02 - 06100

Big Creek Powerhouse #4
Visual Materials
Big Creek Powerhouse #4 - Adit to surge chamber in Tunnel #2
photCL SCE 02 - 41350
Image not available
Construction of Big Creek Powerhouse 1 and 2
Visual Materials
Construction of Big Creek Powerhouse 1 and 2: Camp 7; meat house; Tunnels 3 and 4 east portal; Flowline; Dams 1, 2, 3, and 4; Powerhouse 1 and Powerhouse 2 switchboards; Oil switches; High tension bushings; Stand pipes and surge chamber. Photographer: Stone & Webster Engineering Corporation.
photCL SCE

Big Creek Powerhouse #4
Visual Materials
Big Creek Powerhouse #4 - Heading at surge chamber adit (left) Tunnel #2.
photCL SCE 02 - 41351