Skip to content

Manuscripts

New Brighton Tower: notes, sketches & photos taken during construction

Image not available



You might also be interested in

  • Image not available

    Lancashire, Derbyshire, and East Coast Railway Bridge over River Trent Near Tuxford, Nottinghamshire: notebook

    Manuscripts

    This notebook charts the progress of the bridge's construction from the preparations for sinking of the midstream cylinders in March 1896 to the building and launching of the main girders and the riveting of the cross girders in October 1896. Supplementing the text throughout is a series of 70 photographs, as well as sketches and drawings and graphs showing progress of some of the operations.

    mssHM 75697

  • Image not available

    Surgical notes: notebook

    Manuscripts

    This notebook contains handwritten surgical notes (30 pages) by a Dr. Carmen (first name is unknown), probably in California. The notes are undated but the approximate date is 1856. The subjects vary and include: colds, burns, blood vessels, aneurysms, small pox, cancer and many others. There are also a few pages of "General Remarks." The volume also contains a 12-page index near the back of the notebook. Most of the volume is blank. On the inside front cover is a note about the provenance of the notebook.

    mssHM 80415

  • Image not available

    Notes taken by an American student on Ferdinand Jacob Redtenbacher's lectures on construction of machinery

    Manuscripts

    Two manuscript volumes of lecture notes written by an unidentified American student (possibly with the initials "C.H."); written in a legible hand with numerous diagrams and illustrations in the text. The lectures were held at the Polytechnikum Karlsruhe in Germany (now the Technische Hochschule Karlsruhe). Volume 1, dated 1861-1864, contains lecture notes on the construction of machinery and is followed by the printed text of Tafeln zu Dr. Redtenbacher's Vortragen uber Maschinenbau in 13 nach dem Vortrag folgenden Lieferungen, 1862. Volume 2, dated 1862-1863, contains notes from the lectures of Reinhard Baumeister, Franz Keller and Hermann Sternberg; the lectures cover such subjects as bridges, cofferdams, practical arched construction, the Mt. Cenis tunnel, water works, and the process of tendering. Both volumes are damaged, with missing spines, though a portion of the spine from Volume 2 has been preserved.

    mssHM 83387 (Vols. 1-2)

  • Image not available

    New operating Machine for sluice gates during construction

    Visual Materials

    The Aswan Dam Photographs collection contains 28 albums containing more than 1750 black-and-white photographs (most approximately 8 x 10 in. format), documenting the construction of the first Aswan Dam and Asyut Barrage from 1899 to 1902, the first dam heightening from 1907 to 1912, the Isna Barrage from 1907 to 1909, and the second heightening from 1930 to 1933. The images chiefly chronicle progress at the construction sites and depict laborers, masonry work, excavating, the transportation of materials and equipment, and the building of the locks, buttresses, gates, canals, and bridges, with many views of the Nile River. In addition there are images of repairs to the temple at Philae (in Albums 1, 3b, 4, and 12), and some photographs of ceremonies including the H.R.H. The Duke of Connaught laying the foundation stone on February 29, 1908 (Album 10, pages 8-9), and the laying of the final stone with Abbas II Hilmi, the Khedive of Egypt, on February 9, 1909 (Album 5, page 24).The collection consists of both nondescript albums with affixed photographs accompanied by typed or handwritten captions, as well as more formal presentation albums, which include inscriptions of W. L. Lowe Brown, resident engineer at the Asyut Barrage (Album 1); John Aird, whose company constructed the dam (Albums 2, 6, and 8) Murdoch MacDonald, chief engineer beginning in 1902 (Album 3); While most of the albums are limited to photographs and captions, Album 1 and 2 have an eight-page printed preface by William E. Garstin and Albums 5 and 6 have two introductory pages of printed explanatory notes by Murdoch MacDonald. Photographers engaged in documenting the construction and heightening projects were D.S. George (construction of the Aswan Dam and first heightening), F. Fiorillo (first heightening), A. Gianny (viewing of Aswan Dam), A. Marques (first heightening), and other unidentified photographers. Within the materials, there are variant spellings of Aswan including Assuan and Asswan.

    photCL Burndy 1

  • Image not available

    Buttresses during construction

    Visual Materials

    The Aswan Dam Photographs collection contains 28 albums containing more than 1750 black-and-white photographs (most approximately 8 x 10 in. format), documenting the construction of the first Aswan Dam and Asyut Barrage from 1899 to 1902, the first dam heightening from 1907 to 1912, the Isna Barrage from 1907 to 1909, and the second heightening from 1930 to 1933. The images chiefly chronicle progress at the construction sites and depict laborers, masonry work, excavating, the transportation of materials and equipment, and the building of the locks, buttresses, gates, canals, and bridges, with many views of the Nile River. In addition there are images of repairs to the temple at Philae (in Albums 1, 3b, 4, and 12), and some photographs of ceremonies including the H.R.H. The Duke of Connaught laying the foundation stone on February 29, 1908 (Album 10, pages 8-9), and the laying of the final stone with Abbas II Hilmi, the Khedive of Egypt, on February 9, 1909 (Album 5, page 24).The collection consists of both nondescript albums with affixed photographs accompanied by typed or handwritten captions, as well as more formal presentation albums, which include inscriptions of W. L. Lowe Brown, resident engineer at the Asyut Barrage (Album 1); John Aird, whose company constructed the dam (Albums 2, 6, and 8) Murdoch MacDonald, chief engineer beginning in 1902 (Album 3); While most of the albums are limited to photographs and captions, Album 1 and 2 have an eight-page printed preface by William E. Garstin and Albums 5 and 6 have two introductory pages of printed explanatory notes by Murdoch MacDonald. Photographers engaged in documenting the construction and heightening projects were D.S. George (construction of the Aswan Dam and first heightening), F. Fiorillo (first heightening), A. Gianny (viewing of Aswan Dam), A. Marques (first heightening), and other unidentified photographers. Within the materials, there are variant spellings of Aswan including Assuan and Asswan.

    photCL Burndy 1

  • California Electric Power Corp. - Southern Sierras Power Co. - Collection of photos taken during the construction of Agnew Lake Dam and Gem Lake Dam to provide head for Rush Creek Powerhouse.  Photos of powerhouse construction and movement of materials to construction sites are also included

    California Electric Power Corp. - Southern Sierras Power Co. - Collection of photos taken during the construction of Agnew Lake Dam and Gem Lake Dam to provide head for Rush Creek Powerhouse. Photos of powerhouse construction and movement of materials to construction sites are also included

    Visual Materials

    California Electric Power Corp. - Southern Sierras Power Co. - Collection of photos taken during the construction of Agnew Lake Dam and Gem Lake Dam to provide head for Rush Creek Powerhouse. Photos of powerhouse construction and movement of materials to construction sites are also included.

    photCL SCE 13 - vol 132