Visual Materials
Big Creek initial development
You might also be interested in

Big Creek Initial Development
Visual Materials
Brochure "Big Creek Initial Development" (1914) - Pacific Light & Power Corporation - Booklet (8x10) with colorized, panoramic photos, maps, text and illustrations describing the proposed development of hydroelectric power from Big Creek and the San Joaquin River. The initial project includes four dams, two tunnels, two powerhouses, two 240 mile transmission lines, one substation and a 56 mile railroad to the project. A letter written in 1982 by Mrs. Bernell Smith who lived on the project as a child is included with this brochure. In the letter she talks about the primitive housing and how much fun she had living there
photCL SCE 13 - vol 170
Image not available
Big Creek and Kern River
Visual Materials
Coyote Lake at head of Big Creek; Big Creek [cascade above Powerhouse1 site], Stevenson Creek Falls, Thousand Island Lake; Borel Powerhouse and cottages; Borel interior with the original 5 Pelton Waterwheel unit], Kern Substation, Indian Substation, Newhall Substation; Azusa hydroelectric Plant; Sierra hydroelectric Plant; Mentone hydroelectric Plant; Redondo Steam Plant.
photCL SCE
Image not available
Edison employee album of Big Creek [?] scenes
Visual Materials
Snapshots by Edison employee, Lynn Harrington, of hydroelectric project, possibly of Big Creek, scenery, and group gatherings. A few pictures are identified. There are at least two pictures of Harrington.
photCL SCE
Image not available
Big Creek: Big Creek scenery and Huntington Lake Lodge
Visual Materials
Big Creek Scenery and Huntington Lake Lodge. Photographs around Big Creek, Powerhouse No. 1, Stevenson Creek Camp, Basin Laundry near Camp 3, Pitman Creek, Big Creek Hotel, Indian Hut, Dawn Lumber Mill and Yard, winter scenes, Nellie Lake frozen, Kaiser Crest, Home Camp Creek, Big Falls on Pitman Creek, corral at Cattleman's Camp, Rancheria Creek, Huntington Lake Lodge and Cottages, boating.
photCL SCE
Image not available
Long Beach Steam Station construction, Big Creek, Mill Creek, Santa Ana River, Big Bear Lake
Visual Materials
Long Beach Steam Station No. 1 construction, interior of generator floor; man with divining rods; Kern River No. 3, including headquarters camp, plant site, river, Fairview Dam with fish ladder; Big Creek, including Huntington Lake, Huntington Lake Lodge, Dam 4, cottages, Powerhouse No. 8, road construction to Powerhouse No. 3; Santa Barbara facilities, including Substations, car barn, steam plants; Mill Creek No. 1, Santa Ana River No. 2 flowline, Santa Ana River No. 1 intake and siphon; Union Power Co. hydroelectric projects, such as multiple arch dam at Big Bear lake, tunnels and adits.
photCL SCE
Image not available
Big Creek: Accompanying Report on possible future hydroelectric-electric developments in vicinity
Visual Materials
Photographs with detailed typescript captions accompanying a Big Creek survey for potential future projects, including weirs on Stevenson Creek, Pitman Creek, Balsam Creek, Jackaboy Creek, and Music Creek; Red Lake, Florence Lake area, diversion south fork of San Joaquin River near Blaney Meadows, Jackass Dike, Bear Creek, Mono Creek, Mammoth Pool, Vermilion Valley dam site, Italian Bar, and Devil's Gorge.
photCL SCE