End of construction of Long Beach Steam Plant No. 1, including turbine installations, control rooms, transformers, cooling water system, plant start-up; Beginning construction for Plant No. 2, including excavation, driving piles for Plant 2 foundation.
photCL SCE
Image not available
Visual Materials
Construction and operation of Long Beach Steam Plant No. 1: assembly turbine No. 1, generator room, boiler room, transformer house, overview from top of [Salt Lake] Bridge.
photCL SCE
Image not available
Visual Materials
Constructing San Bernardino Steam Plant, transformer assembly, water tank, boiler construction, turbine assembly, switchyard; Facilities at Bakersfield, Goldfield, Tonopah, Owens River, Elsinore, San Bernardino, San Jacinto, Corona, Hemet, Perris, El Centro, and Coachella; Bishop hydroelectric facilities and construction of South Lake Dam; Nevada mining operations; Gem, Tioga, Saddlebags, Agnew, Summit, Rhinedollar, Crystal, Mono, and Lundy Lakes; Mill Creek hydroelectric construction, including Mill Creek [Lundy] Powerhouse, wood-stave flowline, penstock, Lundy Dam. Photographer: Southern Sierras Power Company.
photCL SCE
Image not available
Visual Materials
Photograph report on the construction of the San Bernardino Substation and Operating building by Southern Sierras Power Company in 1928. Photographer: Southern Sierras Power Company.
photCL SCE
Image not available
Visual Materials
Long Beach Steam Station No. 3 construction, including superheater, header, boiler assembly, skylight over Turbo Room, flue opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.
photCL SCE
Image not available
Visual Materials
Condenser installation, stacks, south elevation poured, turbo installations, turbo room construction, boiler room construction, bricking the boilers, exterior shot complete with 8 stacks on Plant 2, control room. Piles placed for Plant 3 construction, moving above ground fuel storage tank by floating.
photCL SCE