Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Image not available
Visual Materials
Miscellaneous Transmission Towers, Transmission Lines: LA#3-Long Beach, L.B.-Colton (collapsed tower), Kern River T/L, Santa Barbara T/L, Tejon Sub., KR#3-Vestal, Eagle-Bell, Big Creek T/L; raising Big Creek Towers; misc. non-SCE towers,
photCL SCE 13 - vol 074
Image not available
Visual Materials
Transmission Lines, including Brea Camp on the Lighthipe-Chino 66kV transmission line, mess hall, kitchen, hospital tent; Long Beach-Lighthipe-Laguna Bell transmission line, including multi-circuit tower construction, driving piles for tower foundations, collapsed Long Beach transmission line tower; Vincent 220kV transmission line, including road building, Construction Camps 2, 3, 6, 8, 9, and 10, Camp 6 kitchen and mess hall, Maple Canyon, Big Tujunga, transporting tower materials, tractors pulling graders, pack trains, building towers, pulling cable, cable splicing.
photCL SCE
Image not available
Visual Materials
Transportation, Vincent Transmission Line, and Stream gaging. San Joaquin and Eastern Railroad; Incline railroads at Big Creek Powerhouse No. 2, Powerhouse No. 3, and Powerhouse No. 8, Project 3 road construction in San Joaquin Canyon; winter transportation service, road construction for Florence Lake and Tunnel project; Trucks at Mono-Bear siphon; Vincent Transmission Line construction; Stream gauging; Mammoth Pool dam site; Westside projects, Powerhouse 8 Transmission Line; Views of Big Creek general office, machine shop, and radio room; Huntington Lake; Big Creek Powerhouse No. 1 and penstocks; Boylston Street drafting room during the peak of Big Creek construction; Eagle-Bell transmission line; Long Beach Steam Station.
photCL SCE
Image not available
Visual Materials
Big Creek rivers and streams; Powerhouse 2 interior; Cascada general office; Huntington Lake Lodge, Huntington Lake and Dam 1, Shaver Lake, Powerhouse No. 2, Powerhouse No. 8 interior and exterior, Dam 6 and Intake 3, Powerhouse No. 3; Vestal, Eagle Rock Substation, Laguna Bell Substation; Mill Creek No. 1 exterior and interior; Kern River No. 3 exterior and interior, Kern River No. 1 interior; Long Beach Steam Plant No. 1; Camp on Eagle-Bell Line near San Gabriel; Edison Executive portraits; and Edison General Office at 3rd and Broadway, Los Angeles.
photCL SCE

Visual Materials
Miscellaneous Transmission - Kern River #3-Vestal line - extension legs of towers
photCL SCE 02 - 06306
Image not available
Visual Materials
Azusa Line; Big Creek construction - Dam 2, towers, Powerhouse 2, Richgrove Patrol Sta.; Borel change to Pelton-Francis horizontal turbines, break in canal, Bodfish Flume, repairs at Schoolhouse Cut, Profanity Flume; San Bernardino "C" Street Substation, Long Beach Steam Plant, Santa Ana River 2; Fillmore Substation; PLandP trucks and wagons; Huntington Beach Substation; East Kern Line; Kern Canal, settling basin, Borel Powerhouse; Mentone - siphon, flume break, fish screen, intake; L.A. City Power Dev. Plant 1; Pedley Powerhouse - break in canal; Redondo Steam Plant; Sierra Powerhouse; Stone Castle, Vernon Substation, Santa Paula Substation, Monolith Substation, and Eagle Rock Substation.
photCL SCE