Visual Materials
Photographs and clippings of Borel, Santa Ana River, Mill Creek, and Kern River
You might also be interested in
Image not available
Borel, Kern River No. 3, Santa Ana River No. 1, Mill Creek, PL&P construction photos from 1903, and Bear Valley Dam (Union Power Co.)
Visual Materials
Photographs of Borel flume and canal work (mostly un-numbered), Borel headworks, Borel Powerhouse, Kern River No. 3 construction, Santa Ana River No. 1 powerhouse, Santa Ana River 1 intake, Santa Ana River 1 settling basin, Santa Ana River No. 2 powerhouse, Mill Creek No. 1 Powerhouse, Mill Creek No. 3 intake, Mill Creek cottages, Santa Ana River No. 3 flume construction, Pacific Light & Power construction Photographs from 1903, Bear Valley Dam (Union Power Co.), Mill Creek 2 and 3 Powerhouse, Santa Ana River flood damage.
photCL SCE

Photos of Borel, Kern River #3, Santa Ana River #1, Mill Creek, PL&P construction photos from 1903, and Bear Valley Dam (Union Power Co.)
Visual Materials
Photos of Borel flume and canal work (mostly un-numbered), Borel headworks, Borel Powerhouse, Kern River #3 construction, Santa Ana River #1 powerhouse, SAR 1 intake, SAR 1 settling basin, SAR #2 powerhouse, Mill Creek #1 Powerhouse, Mill Creek #3 intake, Mill Creek cottages, SAR #3 flume construction, PL&P construction photos from 1903, Bear Valley Dam (Union Power Co.), Mill Creek 2&3 Powerhouse, SAR flood damage.
photCL SCE 13 - vol 073
Image not available
Kern River Project; Kings River
Visual Materials
Kings River Powerhouse No. 1 and cottages, headworks, Lucas Creek Flume, Cow Creek flume, Borel Powerhouse with 5 penstocks, Isabella (1907); Kings River No. 1 Water Appropriation Notice, Kings River No. 2 - Camp near Mill Creek, posted notice, material storage, warehouse at Tunnel 9; Kings River No. 3 - South Fork Gorge and Intake site, Crown Valley, Little Brush Creek, construction road, Water Appropriation Notice; Kings River No. 4 - Tehachapi Basin, lumber yards, water appropriation notice at intake site, P.D. Plant and spillway at mouth of Kern Canyon.
photCL SCE
Image not available
Long Beach Steam Station construction, Big Creek, Mill Creek, Santa Ana River, Big Bear Lake
Visual Materials
Long Beach Steam Station No. 1 construction, interior of generator floor; man with divining rods; Kern River No. 3, including headquarters camp, plant site, river, Fairview Dam with fish ladder; Big Creek, including Huntington Lake, Huntington Lake Lodge, Dam 4, cottages, Powerhouse No. 8, road construction to Powerhouse No. 3; Santa Barbara facilities, including Substations, car barn, steam plants; Mill Creek No. 1, Santa Ana River No. 2 flowline, Santa Ana River No. 1 intake and siphon; Union Power Co. hydroelectric projects, such as multiple arch dam at Big Bear lake, tunnels and adits.
photCL SCE
Image not available
Big Creek construction, Kern River, Redondo Steam Station, etc
Visual Materials
Azusa Line; Big Creek construction - Dam 2, towers, Powerhouse 2, Richgrove Patrol Sta.; Borel change to Pelton-Francis horizontal turbines, break in canal, Bodfish Flume, repairs at Schoolhouse Cut, Profanity Flume; San Bernardino "C" Street Substation, Long Beach Steam Plant, Santa Ana River 2; Fillmore Substation; PLandP trucks and wagons; Huntington Beach Substation; East Kern Line; Kern Canal, settling basin, Borel Powerhouse; Mentone - siphon, flume break, fish screen, intake; L.A. City Power Dev. Plant 1; Pedley Powerhouse - break in canal; Redondo Steam Plant; Sierra Powerhouse; Stone Castle, Vernon Substation, Santa Paula Substation, Monolith Substation, and Eagle Rock Substation.
photCL SCE
Image not available
Big Creek, Mill Creek, Kern River, etc
Visual Materials
Big Creek rivers and streams; Powerhouse 2 interior; Cascada general office; Huntington Lake Lodge, Huntington Lake and Dam 1, Shaver Lake, Powerhouse No. 2, Powerhouse No. 8 interior and exterior, Dam 6 and Intake 3, Powerhouse No. 3; Vestal, Eagle Rock Substation, Laguna Bell Substation; Mill Creek No. 1 exterior and interior; Kern River No. 3 exterior and interior, Kern River No. 1 interior; Long Beach Steam Plant No. 1; Camp on Eagle-Bell Line near San Gabriel; Edison Executive portraits; and Edison General Office at 3rd and Broadway, Los Angeles.
photCL SCE