Visual Materials
Big Creek projects and Colorado River survey
You might also be interested in
Image not available
Big Creek projects and Colorado River survey
Visual Materials
Big Creek Project - Penstock sections, Powerhouse No. 1 (Unit 4 installation), Powerhouse No. 2, Florence Lake Dam construction (framing for concrete), Camp Hospitals, Cookhouse, Warehouse, Recreation Hall, Mess Halls, tunnel excavations, Construction Camps (No. 21, No. 64, No. 72, No. 73); Photographs of Colorado River Survey of Sierra Watershed, including Evolution Lake, Garnet Lake, Wanda Lake, Thousand Island Lake, Heart Lake, Desolation Lake, N. Goddard Lake, and Sapphire Lake; Kern River No. 1; Transmission tower construction; [Big Bear dam construction]; Huntington Lake Dam 1; Shaver Dam construction.
photCL SCE
Image not available
Long Beach Steam Station construction, Big Creek, Mill Creek, Santa Ana River, Big Bear Lake
Visual Materials
Long Beach Steam Station No. 1 construction, interior of generator floor; man with divining rods; Kern River No. 3, including headquarters camp, plant site, river, Fairview Dam with fish ladder; Big Creek, including Huntington Lake, Huntington Lake Lodge, Dam 4, cottages, Powerhouse No. 8, road construction to Powerhouse No. 3; Santa Barbara facilities, including Substations, car barn, steam plants; Mill Creek No. 1, Santa Ana River No. 2 flowline, Santa Ana River No. 1 intake and siphon; Union Power Co. hydroelectric projects, such as multiple arch dam at Big Bear lake, tunnels and adits.
photCL SCE
Image not available
F.P.C. Vol. 1, Projects 67 and 120 - Construction of Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion
Visual Materials
Florence Reservoir, Florence Tunnel, and Mono-Bear. Views include Big Creek Canyon; Florence Lake Dam site, including diamond drilling, clearing site, crib dam; Florence Lake Dam construction, forms construction; Florence Tunnel intake, tunnel excavation; Mono Dam construction: Mono-Bear junction; Mono-Bear siphon construction.
photCL SCE
Image not available
Big Creek, Mill Creek, Kern River, etc
Visual Materials
Big Creek rivers and streams; Powerhouse 2 interior; Cascada general office; Huntington Lake Lodge, Huntington Lake and Dam 1, Shaver Lake, Powerhouse No. 2, Powerhouse No. 8 interior and exterior, Dam 6 and Intake 3, Powerhouse No. 3; Vestal, Eagle Rock Substation, Laguna Bell Substation; Mill Creek No. 1 exterior and interior; Kern River No. 3 exterior and interior, Kern River No. 1 interior; Long Beach Steam Plant No. 1; Camp on Eagle-Bell Line near San Gabriel; Edison Executive portraits; and Edison General Office at 3rd and Broadway, Los Angeles.
photCL SCE
Image not available
Kern River Project; Kings River
Visual Materials
Kings River Powerhouse No. 1 and cottages, headworks, Lucas Creek Flume, Cow Creek flume, Borel Powerhouse with 5 penstocks, Isabella (1907); Kings River No. 1 Water Appropriation Notice, Kings River No. 2 - Camp near Mill Creek, posted notice, material storage, warehouse at Tunnel 9; Kings River No. 3 - South Fork Gorge and Intake site, Crown Valley, Little Brush Creek, construction road, Water Appropriation Notice; Kings River No. 4 - Tehachapi Basin, lumber yards, water appropriation notice at intake site, P.D. Plant and spillway at mouth of Kern Canyon.
photCL SCE
Image not available
Big Creek construction
Visual Materials
Big Creek, including tunnel excavation, Bear Dam, Mono Dam, Mono-Bear siphon construction; Florence Lake Dam construction, Ward Tunnel spilling; Shaver Lake Dam construction, concrete mixing plant, first concrete, screening plant, Quarry, Powerhouse 2A construction, Stevenson Test Dam construction; Gauging San Joaquin River, Herminghaus Ranch.
photCL SCE