Skip to contentNo. 1157. Reinforcement of solid dam - Types of two metres and three metres non-corrosive perforated pipes. Foot guides, plain coupling and left hand reducing coupling for top or pipe. These pipes are being grouted into the bore holes in the upstream face of the dam | Collections | The Huntington