Rare Books
Reception of the remains of President Lincoln, at Chicago, May 1, 1865. : Order of procession
- Description
- A black silk keepsake from President Abraham Lincoln's funeral procession in Chicago, Illinois. The "Order of procession" is printed in gray, and lists the pall bearers, guard of honor, and general procession, and indicates the place in line where the funeral car is. Text at the bottom describes the path of the procession, notes road closures, and lists the preparations for the body's lying in state. There is a beige trim around the edge of the silk, with scalloped ribbon and loose fringe.
- Date
- 1865
- Call number
- 441054:01





