Manuscripts
The first well (crossing No. 1) was drilled during 1907-1908 and oil was struck on 1908, Mar. 04. Oil was struck at a depth of 225 ft. A gusher came through, throwing the oil 75 ft. above the derrick floor
You might also be interested in

The U. S. Oil Co. test well at Cedar Mesa. Drilled 3640 ft., struck mica schist and shot our expectations at least for that place
Manuscripts
mssMarston papers V124/0057

Oil drilling near Goodridge, Utah, after discovery well of 1908, Mar
Manuscripts
mssMarston papers V124/0035

First oil well in San Juan field. Came into production 1908, Mar. Drilled by Ellis and Goodridge
Manuscripts
mssMarston papers V124/0030

The Canyon of Lodore. Looking down at Triplet Falls. Depth about 2500 ft
Manuscripts
mssMarston papers V111/0063

