Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
A sheave on the hoist line that hauled the pipe line up the hill to Kaweah #3 Hydro Plant, ca. 1913.
photCL SCE 04 - 00154

Visual Materials
The hoist line for the penstock at the headquarters camp at Kern River #1 Hydro Plant.
photCL SCE 01 - 00614

Visual Materials
Lytle Creek Hydro Plant while under construction of Penstock. Trench for pipeline at upper left. Pipe sections stored prior to assembly in middle ground.
photCL SCE 01 - 00120

Visual Materials
Lytle Creek Hydro Plant - Believed to be the blow-off cock in the penstock at .
photCL SCE 01 - 00825

Visual Materials
The penstock at the top of the hoist line about to be lowered into the tunnel at Kern River #1 Hydro Plant.
photCL SCE 01 - 00620

Visual Materials
Construction of Mill Creek #3 Hydro Plant showing the hoist line #6 for the flowline.
photCL SCE 01 - 00042