Visual Materials
Ward Tunnel outlet
You might also be interested in
Image not available
Big Creek: Construction on Florence Lake (Ward) Tunnel
Visual Materials
Florence Lake Tunnel No. 6 (Ward Tunnel): Photographs of Electric train, concrete batch cars, group photographs of laborers, powder magazine, setting drills, firing switches, steam shovel, tunnel mucking, tunnel breakthrough, tunnel mess train, first round at intake portal, intake portal, outlet portal with flow, outlet flume washout; Camps 31, 60, 61, 62, 63, including library, bath house, housing, boxing match, tool sharpening shop, hospital, office, kitchen, cold storage, ice house, warehouse, dining room, sawmill, the Editors' Party, transmission line, blacksmith shop; Huntington Lake: Daw's Cottage.
photCL SCE

Big Creek - Construction on Florence Lake (Ward) Tunnel
Visual Materials
Big Creek - [Construction on Florence Lake (Ward) Tunnel - Adit, Electric train, concrete batch cars, group photos, powder magazine, setting drills, firing switches, steam shovel, tunnel mucking, tunnel breakthrough, tunnel mess train, first round at intake portal, intake portal, outlet portal with flow, outlet flume washout; Camps 31, 60, 61, 62, 63 - Library, bath house, housing, Kangaroo Court, boxing match, tool sharpening shop, hospital, office, kitchen, cold storage, ice house, warehouse, dining room, sawmill, Editor's Party, transmission line, blacksmith shop; Huntington Lake - Daw's Cottage; Cascada - Recreation Hall.]
photCL SCE 13 - vol 024

Big Creek, Florence Lake Dam - Flume along reach below Ward tunnel outlet
Visual Materials
Big Creek, Florence Lake Dam - Flume along reach below Ward tunnel outlet - The house which is located near the barn, having been undermined has fallen and broken in two. This building has since been removed.
photCL SCE 02 - 14795

Big Creek, Florence Lake Dam - Ward Tunnel
Visual Materials
Big Creek, Florence Lake Dam - Ward Tunnel - outlet recorder house and vent pipe.
photCL SCE 02 - 27140