Opening Hours
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108
Visual Materials
Daily: 10 A.M.–5 P.M.
Closed on Tuesdays
1151 Oxford Road
San Marino, CA 91108

Visual Materials
Stringing conductor for transmission line in remote desert foothills - [with 35 variants]
photCL SCE 06 - 71117
Image not available
Visual Materials
[Construction of 500kV transmission line through desert and agricultural lands - tower construction and stringing of conductor] [with 11 variants]
photCL SCE 06 - 72461

Visual Materials
[Drawings showing linemen stringing high voltage conductors onto suspension insulators on transmission towers.] [with 12 variants]
photCL SCE 06 - 72384

Visual Materials
Vincent-Lugo 500kV transmission line under construction. [color, with 2 variants (one is a B&W copy neg)]
photCL SCE 08 - 00256

Visual Materials
[Constructing concrete footings for "aesthetic" high voltage transmission towers -] [with 40 variants (28 are on 35mm film)]
photCL SCE 06 - 72667
Image not available
Visual Materials
Transmission line construction, and conductor stringing near a substation [with 8 variants]
photCL SCE 06 - 71428